Oceanic
Exploration
Feasibility Study for the East Timor Pipeline
|
|
2.3 RECOMMENDIATIONS
- More detailed information
is required of the pipeline route, geotechnical nature of the route
and environmental data.
- Further engineering needs
to be performed to determine accurately the pipeline dimensions and
wall thicknesses.
- The LNG location at Suai
needs to be considered further, including the ease of docking LNG tankers
there.
- Consider alternative landfall
locations, which may provide easier access to the domestic market.
W:\Oil&Gas\Joint
Ventures\Intec\Projects\Pw Perth projects\0063.01 Oceanic East Timor\P0063.01Rev
1-with changes.doc
Page 3 13 June 2002
NEXT
SLIDE
|